Difference between revisions of "User:DukeEgr93/Arduino 110"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
This page will serve as development space for the ECE 110 conversion to Arduinos. | This page will serve as development space for the ECE 110 conversion to Arduinos. | ||
+ | |||
+ | == Document Preparation == | ||
+ | {| class="wikitable" | ||
+ | |+Section Completion | ||
+ | |- | ||
+ | |Section | ||
+ | |Last Update | ||
+ | |Status | ||
+ | |Notes | ||
+ | |- | ||
+ | |Preface | ||
+ | |12/19/2013 | ||
+ | |'''Ready''' | ||
+ | | | ||
+ | |- | ||
+ | |Updates | ||
+ | |12/19/2013 | ||
+ | |'''Ready''' | ||
+ | | removed | ||
+ | |- | ||
+ | |Acknowledgments | ||
+ | |12/19/2013 | ||
+ | |'''Ready''' | ||
+ | | | ||
+ | |- | ||
+ | | Lab 1 | ||
+ | |12/19/2013 | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |||
+ | |} | ||
+ | |||
== Lab 1 == | == Lab 1 == |
Revision as of 21:06, 19 December 2013
This page will serve as development space for the ECE 110 conversion to Arduinos.
Document Preparation
Section | Last Update | Status | Notes |
Preface | 12/19/2013 | Ready | |
Updates | 12/19/2013 | Ready | removed |
Acknowledgments | 12/19/2013 | Ready | |
Lab 1 | 12/19/2013 | ||
Lab 1
Connecting the Parallax Digital Trainer to the BOE Shield
This requires two male-to-male 3-header cables.
- The first cable will go from channels GND/13/12 on the BOE Shield to channels GND/P0/P1 on the PDT. The black wire should be on GND; for the BOE Shield, that is the second-to-leftmost pin on the top bus while for the PDT, that is the fourth pin from the top on the left of the socket.
- The second cable will go from channels 2/3/4 on the BOE Shield to P2/P3/P4 on the PDT. The black wire should be on pin 2 of the BOE Shield and in the sixth-from-the-bottom socket on the PDT. The white wire should be on pin 4 of the BOE Shield and in the fourth-from-the-bottom socket on the PDT.